The department has produced a number of publications and templates to provide guidelines to districts for project planning, CIP (AS 14.11) application submittals, and project administration. Related reports published for the legislature have also been made available.
The following department publication has been revised and public comment is being sought on the draft revisions:
To view the resources provided by DEED in each of the sections below, click or otherwise activate each section header.
Contact Facilities staff for a template to request DEED approval
For the current CIP application, instructions, eligibility checklist, scoring criteria, guidelines for raters, and Cost Model - refer to
Links to external resources are provided as a public service and do not imply endorsement
Seismic Information - The information below was prepared in 2009 by the Alaska Seismic Hazard Safety Commission and submitted to the department in order to assist school districts in their review of seismic hazard and risk. The information contained in the documents below should be used for reference only, and decisions based on the information should be accomplished by geologists, geotechnical engineers, or structural engineers as appropriate.
School Capital Project Funding Report – An annual report to the legislature on the effectiveness and funding sources of the state aid for school construction and major maintenance grants and debt reimbursement, as required by AS 14.11.035.
Statewide Six-Year Plan – Compiled from the district plans submitted to the department, primarily through the CIP process in the fall. Provides an overview of projects and estimated costs that are anticipated by the districts over the next six fiscal years.
Prototype School Construction Report – A report to the legislature on the benefits and disadvantages of prototypical school design and construction in Alaska, as required by Chapter 15, SLA 2014 (HB 278).
School Capital Project Funding Report Under HB 2003 - A report to the legislature on the effectiveness of the school school construction grant and school construction debt reimbursement programs utilizing general obligation bonds during the period November 2002 to December 2004, as required by Chapter 3, SSSLA 2002 (HB 2003).
If you would like an original copy of the map, please e-mail Lori Weed or call (907) 465-2785.